Skip to content
Crochet Stitch CounterPRO
Tool #60 • Pattern reading and troubleshooting toolscalculator

Crochet Frog-Back Planner

Record the last correct checkpoint and calculate rows or rounds to undo.

Live Crochet Frog-Back Planner

Instant browser calculations & session state saved locally.

Auto-saved to Browser
Calculated Output
Ready to calculate

Adjust inputs above and click Calculate to compute customized recommendations.

Key Capabilities

  • ✓Calculates exact rows and stitches to unravel based on mistake location
  • ✓Live loop recovery checklist to prevent dropped crochet stitches
  • ✓Tink vs Frog advisory based on distance back to the error
  • ✓Emotional encouragement note for makers who dread frogging

Expert Crafting Advice

  • 💡Insert a smaller hook or locking marker into the target stitch before pulling yarn out to stop unraveling exactly in place.
  • 💡Unlike knitting, crochet will not unravel downwards past the row being pulled.

How the Crochet Frog-Back Planner Works

The Crochet Frog-Back Planner works in 4 steps.

  1. 1

    Enter the current row

    Type the row or round you are on, such as 45.

  2. 2

    Enter the mistake row

    Type the row that holds the error, such as 38.

  3. 3

    Press Calculate Result

    Read the rows to frog, then multiply by stitches per row for the stitch total.

  4. 4

    Mark the stop point

    Place a stitch marker in the last correct row so you stop in the right place.

Crochet Frog-Back Planner Formula

The Crochet Frog-Back Planner formula counts the rows from the current row back to and including the mistake row.

Rows to frog = Current row − Mistake row + 1

Stitches to frog = Rows to frog × Stitches per row

Restart row = Mistake row

Current row
The row on the hook
Mistake row
The row containing the error

Worked example: Current row 45, mistake on Row 38, 60 stitches per row. Rows to frog = 45 − 38 + 1 = 8, and stitches to frog = 8 × 60 = 480. You restart on Row 38.

Crochet Frog-Back Planner Conversion Table

The Crochet Frog-Back Planner conversion table shows stitches unraveled and approximate yarn reclaimed for 60-stitch rows of worsted double crochet, at about 1.3 yards (1.2 m) per 10 stitches.

Rows to frogStitches unraveledYarn reclaimed (yd)Yarn reclaimed (m)
1607.87.1
212015.614.3
424031.228.5
636046.842.8
848062.457.1
106007871.3
15900117107
201200156142.6

Yarn per stitch varies with stitch height and tension. Weigh frogged yarn for an exact figure.

What is a Crochet Frog-Back Planner?

A crochet frog-back planner is a calculator that records your last correct checkpoint and works out how many rows or rounds to rip out to reach a mistake. The Crochet Stitch Counter Crochet Frog-Back Planner shows the cost of frogging before you pull the yarn.

Frogging means unraveling crochet, named for the sound of "rip it, rip it". A mistake on Row 38 found on Row 45 means ripping 8 rows: Rows 45 back through 38. Knowing the number lets you decide between frogging and a local fix.

The planner gives the rows to undo and the stitches that come out.

What are the Uses of a Crochet Frog-Back Planner?

There are 4 main uses of a Crochet Frog-Back Planner.

  • Deciding whether to frog

    The row total shows the real cost of the fix.

  • Stopping at the right row

    The restart row prevents ripping too far.

  • Recounting after frogging

    The counter resets to the restart row.

  • Reclaiming yarn

    Stitch totals estimate yarn returned to the ball.

View All 70 Tools →